The day finally arrived. Picked up the van just after they opened at 8:30 and headed toward Newark. Richard@GBS greeted me on arrival with a cup of coffee – always a good start.
Refreshed I pulled to van towards the roller shutter and we started checking off and loading the van.
Slowly the van filled: box by box and package by package, with Richard@GBS providing a commentary of the build instructions and potential snags and solutions as we went.
The checking process was thorough with each item on the bill of materials being ticked off one at a time. There are a huge number of parts for a complete kit so this took over 3 hours. Disappointingly GBS did have some bits missing:
- Tyres – they had been “borrowed” for the track day
- Brake reservoir and cap – having supply issues
- Catalyst – although Richard@GBS explained that he is developing a new exhaust with built in Cat which can be re-packed (I will probably swap for this when it’s ready)
- Steering column surround
- Anti freeze
Richard@GBS also mentioned that he is working on a new idle sensor to link into the Emerald ECU. I must remember to ask him about this again nearer the time.
Last to go in (not in the photo) was the GRP, followed by the engine right at the back for easy unloading, and finally the gearbox.
I made the mistake of not fully securing the gearbox before I set off. Whilst driving along the A38 a dog was loose running along the verge. A firm touch of the brake and a thud from the back of the van. I stopped in a near by layby to find the gearbox had rolled forward into the GRP nosecone !!
I hope scratches can be easily polished out 🙁