There are many, many places I can start. Every box I open contains something I can fix to the chassis, build into a sub-component or clean up ready to fix.
I want to leave the chassis as open as I can whilst the build gets underway. By that I mean I don’t want to fix the side panels too early and thereby become encumbered by them when I don’t need too. I also think that there is a significant risk of me damaging the side panels whilst doing other jobs if I fix them too early. I must however be cognisant that some of the panels must be fitted in a specific sequence such as the outer side panel before the front suspension, or they simply won’t go on.
So, my short term goal is to get the cable and pipe routings around the vehicle clearly understood before I start permanently fixing panels.
I will start with the brake pipes….